Same DayCoatings

Learning center

Moisture Testing Before Coating

Moisture vapor moving up through concrete is the number one cause of coating delamination. A test that costs almost nothing tells you whether your floor is a candidate, or a future blister.

Calcium chloride test kits and taped plastic sheets on a bare concrete slab
Test methods compared
MethodStandardTimeMeasures
Calcium chlorideASTM F186960-72 hoursSurface emission, lbs / 1,000 sq ft / 24 hr
In-situ relative humidityASTM F217072 hours after probe setInternal slab RH, %
Plastic sheet testASTM D426316 hoursPass/fail indication only

What the numbers mean

  • Under 3 lbs / 1,000 sq ft / 24 hr: most coatings are safe
  • 3 to 5 lbs: moisture-tolerant primer recommended
  • Over 5 lbs: moisture-mitigating epoxy primer required
  • Under 75% internal RH: safe for most systems
  • 75-85% RH: mitigation primer required
  • Over 85% RH: full mitigation system, and reconsider the coating choice

Why in-situ RH is the better test

The calcium chloride test only samples the top half inch of the slab, and it is easily skewed by ambient humidity and by a slab surface that happens to be dry that week. In-situ RH probes drilled to 40 percent of slab depth measure what the concrete will actually release over time once you seal the top.

Slabs most likely to fail a test

  • Poured without a vapor barrier beneath: common in homes built before the 1980s
  • Below grade or partially below grade
  • Downhill of a slope, or with poor exterior drainage against the foundation
  • Less than 60 days old
  • In humid Gulf Coast and subtropical climates year-round
  • Slabs with existing efflorescence, dark patches, or persistent damp spots

What mitigation involves

A 100% solids moisture-mitigating epoxy primer applied over a properly ground slab creates a vapor-resistant membrane rated to hold back high emission rates. It adds roughly $1 to $2 per square foot and usually a cure period before the finish system goes down, which is one of the legitimate reasons a job becomes a two-day install.

The verdict

Never accept a coating quote that does not address moisture. The test is cheap, the mitigation is affordable, and the failure is a full teardown.

Frequently asked questions

How do you test concrete for moisture before coating?
The two reliable methods are calcium chloride testing per ASTM F1869 and in-situ relative humidity probes per ASTM F2170. A plastic sheet test only gives a rough pass-or-fail indication.
What moisture level is safe for floor coatings?
Under 3 lbs per 1,000 sq ft per 24 hours, or under 75 percent internal relative humidity, is generally safe for most systems.
What happens if moisture is too high?
Water vapor pressure pushes the coating off the slab, causing blisters and delamination. A moisture-mitigating primer is required above the safe threshold.
Is in-situ RH better than calcium chloride?
Yes. RH probes measure moisture at 40 percent of slab depth, which reflects what the slab will release over time. Calcium chloride only samples the surface and is easily skewed by weather.
Which slabs are most likely to fail a moisture test?
Slabs poured without a vapor barrier, below-grade slabs, new concrete under 60 days, and slabs in humid Gulf Coast or subtropical climates.

Keep reading

Free, no-obligation quote

Get your free floor coating quote

Tell us about your slab and what you want out of it. You'll get straight answers on the right coating system, realistic pricing, and one-day install options.

  • Coating system recommended for your climate and slab condition
  • Transparent per-square-foot price range before anyone visits
  • Honest answer if a coating is the wrong call for your floor